Organization Performance Analysis by PM3 Maturity Level in Service Area Field Study PT. GBSI

Main Article Content

Karyadi Karyadi
Alfiya Rokhmah
Probokusumo Probokusumo

Abstract

PT. GBSI is a company that operates in the security services business (outsourcing) and serves its customers based on work contracts per certain period (project), it’s classified in Project Based Organization (PBO) category. Project Management Maturity Model (PM3) is a tool widely used to measure project management performance by looking more broadly at 10 knowledge areas in project management. This research aims to perform an analysis by PM3 maturity level in PT. GBSI. PM3 is used to measure PBO performance in the construction, IT, biotechnology sectors, and currently, it has begun used in service sector, education, and public administration, but there has been no research using PM3 in the provider of security services sector. This research tries to use qualitative approach through interview, document analysis, focus group discussion in diagnosing conditions at PT. GBSI, and use PM3 assessment analysis. The assessment results show the average maturity level achievement in all areas for project management organization is 30% from target maturity level 2. The assessment result can identify the maturity level in the organization and therefore identify development needs in 10 knowledge areas PM3, also provide alternative human processes, technostructure, and human resource interventions to cover the gap maturity level for organizational development.


 

Article Details

How to Cite
Karyadi, K., Rokhmah, A., & Probokusumo, P. (2025). Organization Performance Analysis by PM3 Maturity Level in Service Area Field Study PT. GBSI. Sanskara Akuntansi Dan Keuangan, 4(01), 42–57. https://doi.org/10.58812/sak.v4i01.636
Section
Articles

References

J. K. Crawford, Project Management Maturity Model, Fourth Edition, [4th] edit. Boca Raton, London: CRC Press is an imprint of Taylor & Francis Group, LLC, 2021.

L. Domingues and P. Ribeiro, “Project management maturity models: Proposal of a framework for models comparison,” in Procedia Computer Science, Elsevier B.V., 2023, pp. 2011–2018. doi: 10.1016/j.procs.2023.01.502.

Y. Xu et al., “The Theory and Method of Organizational Effectiveness Evaluation,” Atlantis Press, Advances in Social Science, Education and Humanities Research, vol. 664, no. Ichssr, pp. 2419–2423, 2022.

B. S. . Georgopoulos and A. S. Tannenbaum, “A Study of Organizational Effectiveness A Study of Organizational Effectiveness,” American Sociological Association, vol. 22, no. October 1957, 2016, doi: 10.2307/2089477.

D. Seelhofer and C. O. Graf, “National Project Management Maturity: A Conceptual Framework,” Central European Business Review, vol. 7, no. 2, pp. 1–20, 2018.

F. Machado and N. Duarte, “Project Management Maturity Models for Construction Firms,” 2021.

P. M. Institute, A Guide to The Project Management Body of Knowledge, 6th ed. Pennsylvania: Project Management Institute, Publisher, 2017.

A. Miklosik, “Improving project management performance through capability maturity measurement,” Procedia Economics and Finance, vol. 30, no. 15, pp. 522–530, 2015, doi: 10.1016/S2212-5671(15)01264-2.

O. Niema, “Implementation of Project Management Maturity Model to Improve The Self-Goverments,” Proceedings of the International Scientific Conference, vol. 6, pp. 439–448, 2021, doi: doi.org/10.17770.

I. V. Katunina1 and Yu. A. Fomina1, “In search of excellence in social entrepreneurship project management : Experience and standards of the European Union,” vol. 12, no. 2017, pp. 92–101, 2021, doi: 10.17747/2618-947X-2021-1-92-101.

J. Kostalova and L. Tetrevova, “Proposal of Project Management Methods and Tools Oriented Maturity Model,” vol. 9, 2018, doi: 10.5585/gep.v9i1.595.

D. Bjelica, M. Mihić, and D. Petrović, “Web Based Project Management Competences and Project Performances,” Project, European Journal, Management, vol. 7, no. 2, pp. 45–58, 2017.

S. M. Putri, D. Pratami, W. Tripiawan, and G. Rahmanto, “Assessing of project management process knowledge area : procurement based on project management maturity model pmmm ) ( case study of pqr company ) Assessing of project management process knowledge area : procurement based on project management maturity,” IOP Conf Ser Mater Sci Eng, 2019, doi: 10.1088/1757-899X/505/1/012004.

M. Martins, C. Sousa, and J. Magano, “Project management in / the biotechnology industry on Project maturity Project management maturity in the biotechnology,” Procedia Comput Sci, vol. 196, pp. 748–755, 2022, doi: 10.1016/j.procs.2021.12.072.

O. Ziemińska, “Project Maturity Assessment Model Dedicated to The Engineering and Design Office,” Humanities and Social Sciences, vol. 2, no. 2, pp. 79–95, 2022, doi: 10.7862/rz.2022.hss.14.

F. A. Wijaksono, D. Pratami, and B. Achmad Fuad, “Measurement of Risk Project Maturity Using Organizational Project Management Maturity Model ( Opm3 ): Study Case Of Construction Project In Bandung,” IOP Conf. Series: Materials Science and Engineering, p. 7, 2020, doi: 10.1088/1757-899X/852/1/012098.

D. V. Gergert and Yu. O. Shturmina, “Development of Performance Indicators of The Project Management Office Depending on The Level of Maturity Company Project Management,” Perm University Bulletin, vol. 4, no. 31, p. 13, 2016, doi: 10.17072/1994-9960-2016-4-176-188.

H. Ferreira and L. Pereira, “Maturity Evaluation in Project Management and Implementation of a PMO – Case Study,” The International Journal Of Business & Management, vol. 3, no. 11, pp. 338–347, 2015.

S. A. Zarghami and J. Dumrak, “Application of system dynamics in the assessment of project portfolio performance,” International Journal of Industrial Engineering and Management, vol. 11, no. 4, pp. 253–262, 2020, doi: 10.24867/IJIEM-2020-4-269.

S. M. Romero, L. F. Bohorquez, and M. P. R. Puentes, “Application of project management tools in engineering services companies: Four case studies,” Journal of Physics, vol. 1126, pp. 1–7, 2018.

H. Egberongbe, B. Sen, and P. Willett, “The assessment of quality maturity levels in Nigerian university libraries,” Emerald publishing Limited, 2017, doi: 10.1108/LR-06-2017-0056.

E. Głodziński, “Performance measurement embedded in organizational project management of general contractors operating in Poland,” Measuring Business Excellence, vol. 25, no. 3, pp. 271–286, 2021, doi: 10.1108/MBE-06-2019-0051.

O. Niema, “IMPLEMENTATION OF PROJECT MANAGEMENT MATURITY MODEL TO IMPROVE THE EFFICIENCY OF ACTIVITY OF LOCAL SELF-GOVERNMENTS,” SOCIETY. INTEGRATION. EDUCATION. Proceedings of the International Scientific Conference, vol. 6, pp. 439–448, May 2021, doi: 10.17770/sie2021vol6.6479.

A. Hussain Albaiti and H. Eid Alsulami, “The Effect of Project Management Office on the Organizational Performance: A Case Study of Saudi Arabia,” Int Trans J Eng Manag Appl Sci Technol, 2021, doi: 10.14456/ITJEMAST.2021.167.

T. T. Htoo, T. C. Dodanwala, and D. S. Santoso, “Project Management Maturity and Performance of Building Construction Projects in Myanmar,” Practice Periodical on Structural Design and Construction, vol. 28, no. 1, Feb. 2023, doi: 10.1061/ppscfx.sceng-1192.

G. Silvius, “The role of the project management office in sustainable project management,” in Procedia Computer Science, Elsevier B.V., 2021, pp. 1066–1076. doi: 10.1016/j.procs.2021.01.302.

A. Ramadhan, D. Pratami, and P. Y. Prodi, “Perancangan Roadmap Perbaikan Proses Manajemen Proyek Menggunakan Kerzner Project Management Maturity Model (KPM3) Pada Unit SDI di PT. XYZ Wilayah Bandung Barat,” vol. 12, p. 702, Feb. 2025.

C. T. Cerdeiral and G. Santos, “Software project management in high maturity: A systematic literature mapping,” Journal of Systems and Software, vol. 148, pp. 56–87, Feb. 2019, doi: 10.1016/j.jss.2018.10.002.

F. R. Fiantika et al., Metodologi Penelitian Kualitatif, 1st ed., no. April. Padang Sumatera Barat: PT. Global Eksekutif Teknologi, 2022.

E. Murdiyanto, Metode penelitian kualitatif, 1st ed. Yogyakarta: Lembaga Penelitian dan Pengabdian Pada Masyarakat UPN ”Veteran” Yogyakarta Press, 2020.

F. Julio, A. Vanni, S. Amanda, V. Joey, and S. Halim, “Optimizing Shipping Operations through Real-Time Monitoring and Control: A Decision Support System for Container Stripping Processes,” Jurnal Keilmuan dan Terapan Teknik Industri, UK. Petra., vol. 25, no. 1, pp. 43–51, 2023, doi: https://doi.org/10.9744/jti.25.1.43-52.

V. I. Malik and D. Pratami, “The Utilization of Project Management Maturity Models in Enhancing Project Management Capabilities: Case Study of a Project-Based Organization in International Conference on Family Business & Entrepreneurship 2018 The Utilization of Project Management Maturity Models in Enhancing Project Management Capabilities: Case Study of a Project-Based Organization in Indonesia,” no. July, 2018.